Costain - Plumley to Backford CP Project

Plumley to Backford CP Project.

 Client: Costain                 Dates: November 2013 - July 2014

We replaced all existing CP Stations (locations that provide Cathodic Protection Current to the Pipeline) and then added 5 new locations along the B/B(W) pipeline system.

We procured all CP materials for the works, and carried out the replacement of of 12 CP Stations, with the construction of 5 new CP Stations. The works required the construction of the associated CP Groundbeds, pipeline excavations for new pin braze connections, installation of new pipeline & groundbed header cables & CP monitoring cables, installation and termination of new CP test post facilities, along with the construction of the new CP Kiosks and their associated concrete foundations.